Skip to content
Knowledge base ›What's new? ›Version 20 ›Version 20.1 05.08.2026

Version 20.1 05.08.2026

Updated 13 November 2026

Version 20.1 focuses on document flexibility, external calendar integration, and a new consolidated task view.

Custom document variables

Document templates previously supported only a fixed set of system variables. Version 20.1 adds custom variables, so you can define your own fields and have them filled in automatically when a document package is generated.

Creating a variable. Go to Databases → Documentation → Templates → Variables → Custom, and click Add. Each variable has a code (used in the template), a display name, an input type, and an optional comment. Three input types are available:

  • input — a single-line text field, for contract numbers, event titles, and similar short values

  • textarea — a multi-line field, for longer descriptions or payment terms

  • date — a date picker

Using a variable in a template. In your Word template, insert the variable code in the standard syntax: ${variable_code}. When the document is generated, the placeholder is replaced with the value entered for that project.

Filling in values. When creating a document package in a project's Documentation tab, a Custom variables section appears below the standard fields. Fill in the values there, and they are written into every document in the package that uses them.

System variables reference. The full list of built-in variables (dates, amounts, discounts, coefficients, tax values, and their spelled-out equivalents) is available at Templates → Variables → System, with a description of what each variable outputs.

Custom variables require the new template engine. When creating a document package, make sure Template engine is set to "new". The "old" option is kept for compatibility with existing templates.

External calendar: schedules and tasks

The external calendar integration now exports more than projects. Two new options are available in the calendar link settings (Databases → Employees → employee card → Calendar (.ical) → settings):

  • Schedule and vacations — the employee's working schedule and time off

  • Tasks — tasks assigned to the employee

These are configured independently of the Projects option, so a link can carry any combination of the three. Each employee can have up to 10 calendar links; the exact limit depends on your service plan.

Tasks from projects

A new tab has been added to the Table menu: Tasks from projects. It shows a consolidated list of all tasks created inside projects, so you can see at a glance who is responsible for what across all active work.

The table includes the project ID and name, the sheet the task belongs to, the task itself, its period, performer, access level, status, and author. Every column can be filtered, and the table can be searched.

Additional improvements

  • Hungarian forint has been added to the list of available system currencies.

  • Mass return and Overdue returns tables now include a Client column, taken from the project.

  • Labels: page width and height are now validated, so a template cannot be saved with empty or zero values. A "Service comment" variable and an item name field have also been added.

  • Employees are now logged out automatically when their account is deactivated or they are marked as dismissed.

  • Fixed an untranslated string in the English Quotation ("Total — consumables").